Lockdown at Trans-Pecos Pipeline Site in West Texas Consecrates New Indigenous-Led Resistance Camp – Intercontinental Cry

An Indigenous Water Protector and an Alpine, Texas, resident were arrested Saturday morning after locking themselves to pipe-laying equipment at an Energy Transfer Partner (ETP) easement and work site in Presidio County, Texas. The lockdown temporarily halted construction on the company’s 143-mile Trans-Pecos pipeline that, if completed, would carry 1.4 billion cubic feet of fracked gas from West Texas to Mexico every day.The action was the first to be organized by a new Indigenous-led prayer and resistance camp on private land in far west Texas’ pristine Big Bend region. The camp is acting in solidarity with the Sacred Stone and Oceti Sakowin camps’ historic standoff against the Dakota Access pipeline at the Standing Rock Sioux reservation in North Dakota. The same Dallas-based company is behind both the Trans-Pecos and Dakota Access pipelines.

Source: Lockdown at Trans-Pecos Pipeline Site in West Texas Consecrates New Indigenous-Led Resistance Camp – Intercontinental Cry